The modern market for the purchase and sale of electricity requires devices to account for these operations. In the role of the device for this purpose, a two-rate counter is increasingly used. It is a modern multifunctional device for recording energy consumption in the population and industrial enterprises, as well as public and administrative buildings.

Unlike the more familiar one-tariff, the dual-rate electricity meter has a high quality of work. Both the principle of action and the way of registering the testimony changed. This device allows you to make some adjustments to pay consumers electricity bills, because they have the opportunity to set a separate tariff for each time of day. For example, the night tariff for electricity is much lower than in the daytime. A two-tariff counter allows you to take into account all such nuances.

Without a doubt, saving at first may seem small. However, over time it will acquire a sufficiently large value. Therefore, if you still have not decided on the choice of the meter, we recommend that you select an electronic two-rate counter. It is not only more economical, but also makes it possible to make the work of electric stations more optimal, and therefore, to reduce their negative impact on the environment.

The installation of a two-rate meter, as well as its appearance, is not much different from the traditional one-tariff counter, the difference consists only in the fact that at the set time the meter readings on the scoreboard change their values.

The drawback of this device lies in the fact that its initial cost is two times higher than the standard one-tariff. Nevertheless, this circumstance is easily compensated by saving money from paying bills. Another complication is the following: in order to install a two-tariff meter, it is necessary to submit an appropriate application to the branch of energy sales.

Therefore, before starting the installation, it is necessary to prepare all relevant documents, to invite a qualified specialist, and also to prepare the installation site.

You can buy a two-rate counter at specialized trade outlets or you will agree in advance with the master who will be installing it. This electronic device must comply with the current GOST and have permission to sell on the territory of your country.

Installation of the electricity meter is performed at a level of 80 to 170 cm in a room, the temperature of which does not take values below 0 ° С. The connection of the appliance to the power circuits takes place by means of clamps and terminals, and the meter itself is mounted on the shield intended for this purpose.

After the installation process, it is necessary to invite the inspector of the power supply for inspection, sealing and drawing up an act of commissioning. Then a contract is signed with the power supply to pay for electricity through a two-tariff device. A copy of this document must be submitted to the house management or the chairman of the housing cooperative.