When repairing your house or apartment, you need to clearly visualize certain steps that will allow you to carry out work qualitatively. From the observance of these sequences, both the execution time and the final result can depend. Below is provided a list of 20 steps that are performed with every thorough repair of a house or apartment.

20 steps for a successful start and finish of the repair! Observing which can not only consistently speed up the process of repair, but also improve it by respecting building technologies.

1) Preparatory and dismantling works. Removal of furniture and belongings from the premises, dismantling partitions and wall coverings, ceilings and floors (if necessary). Such works include all rough work.

In the houses of old buildings, there are so many garbage that in most cities it is necessary to use the services of garbage disposal to the city dump.

2) Repair and replacement of windows, doors, balcony blocks. Packing them in a protective film to prevent accidental damage during further repairs. Such seemingly trifling helps to avoid many

3) Arrangement of partitions between rooms, niches and arches. This process is not always used, but if the erection of partitions is planned, then it should not be neglected and consistency in its conduct.

4) Electrical work, which includes: the installation of electrical wiring, the transfer of junction boxes, the wiring of an additional network (audio and video, telephone, alarm, etc.). Electrical work includes work on the installation of buried wiring, so they need to pay attention to the initial stage.

5) Piping of heating, sewage and water supply pipes, air conditioning. If necessary, the installation of a filtration system of water and a boiler. It is much more advantageous and more convenient to conduct all the listed communications at the initial stage of repair. For example, if you immediately remove heating radiators in a convenient place for you, then in the future you will not have to do this work and spoil the already sunken wallpaper.

6) The process of plastering the walls (it is necessary to start with a bathroom and a toilet room), since the work in the bathroom is considered the most dusty, then the primary plastering with gypsum mortar with reinforcement in the rooms.

7) Installation of decorative elements - moldings, columns, baguettes, etc.

8) Warming of floors, sound and waterproofing. This stage is not mandatory, but it will not be superfluous, first of all your dwelling will be protected from accidental bays and extraneous noise (for example, neighbors)

9) Facing works.

10) Installation of suspended ceilings, sealing joints.


11) Installation of bathroom fixtures in the bathroom and toilet. Installation of sanitary equipment (sinks, shower cabins, toilet bowls, bidets) are produced on already laid and rubbed tiles.

12) Replacement / installation of door frames and doors, window sills.

13) Warming and finishing of window slopes.

14) Final puttying of walls, preparation for staining or wallpapering. Ceiling of ceilings.

15) Painting of ceilings and walls.

16) Laying the flooring. If necessary, the preliminary leveling of the floor.

17) Wallpaper gluing.

18) Installation of skirting boards, panels and casing for door frames.

19) Installation of air conditioning and heating. Installation of switches, sockets, sensors, lamps.

20) Installation of elements of built-in furniture.

Recommendations

This instruction is not mandatory for implementation, but its compliance provides an opportunity to follow the maintenance plan clearly. It is also possible to break down (distribute) each stage in time. Thus, the repair of apartments can be carried out with strict adherence to the schedule, clearly knowing what work has already been done, and what else should be done.