Wooden houses are considered environmentally friendly and most comfortable for living. They create a wonderful microclimate, and they are extraordinarily aesthetic. However, it's not a secret that the wood is short-lived material, and therefore, in time, it may be necessary to repair a wooden house.

This case is quite complex and time-consuming, but it is quite feasible. The way in which repairs must be carried out depends on the type of house. Wooden buildings can be skeleton, chopped or paved. In the first case, it is often necessary to remove the old lining and replace the insulation. In older frame structures, it is usually a loose material. In this case, repairing a wooden house is much easier. To do this, you need to go up to the attic and provide access to the inner space of the walls. Then seal the old filling with a bayonet shovel . You need to do this carefully to eliminate all voids. After that, top the earth or slag.

In the case of chopped or paved walls, repair of a wooden house will be somewhat more difficult. In such buildings, the lower and upper crowns most often become unusable. They pick up moisture, damage insects, etc. Determine the need for replacement in winter. If the walls are heavily frosty, it means that the wood has accumulated moisture and rotted. Therefore, it is necessary to take appropriate measures to remedy this situation.

Wooden log houses must be repaired in compliance with certain rules. Otherwise, the building can "lead". You will need several bars and a lifting mechanism of sufficient power. The jack is brought under the corner of the house. Raise the wall at one time not more than 2 cm. Then, the released end of the log is removed, and a log is put under the frame. The same is done with the second angle. After that, it remains only to put a new log into place a new one.

Repair of a wooden house in this case can be done with less labor. For this, the log is removed in parts. Such work can be done even without helpers. To do this, as close as possible to the corner, the required log is sawed and the end is taken out from under the walls. Further along the entire length they make the same cuts until they reach the second corner. When using this method, you can raise the corners to a height of only 1 cm. This will be sufficient to install a new log. Preliminary, the foundation must be laid with two layers of ruberoid, pasting it on the bituminous mastic.

Wooden country houses sometimes also require repair of floors. To update the ceiling, you need to dismantle the old boards. You can do this with a crowbar. Then remove the heater and the bottom row of boards. The next stage is the replacement of beams. Beams usually rot on the ends, leaning against walls or posts. Therefore, new elements must be smeared with mastic in these places and wrapped with a ruberoid.

The floors are repaired in approximately the same way. And in this case, the waterproofing of roofing material. At the same time, the floor can also be insulated by fixing a net from the back of the lag from the line and placing mineral wool plates on it. On top of this, bridges of the same thickness are fixed with a polyethylene film for waterproofing. Next, the finishing floor is stuffed.