Before those who decided to make repairs, without seeking the help of professionals, there are many tasks. It would seem that there is something complicated, with our own realities? On the shelves of building hypermarkets, you can find any finishing material, and manufacturers of ready-made mortars eliminate the need to independently beat in the trough solutions, combining in the right proportions of cement, sand and alabaster. The necessary tool can always not only be bought, but even rented. Well, if something is not clear, so the network is full of master classes, step-by-step guides and other good ... It would seem so simple.

But in reality everything is more complicated. Before a beginner, there are often such questions, which he did not even think about. For example, what do you do first - floor or walls? Agree, buying a wallpaper, not everyone will even remember the order of work. These torments will begin later, when the time comes to get down to business. Do not be afraid, in this article we will consider in detail various types of construction operations and their order.

Dismantling

The first thing you need to get rid of the old. Many people, thinking about what they do first - floor or walls, understand this intuitively. By and large, there is not much difference, but it's more convenient to start from the top.

Turn off the power in the room and remove the chandelier. Then take out of the room all the furniture. The exception can be a closet, built-in kitchen furniture, permanently fixed equipment. Remove the old wallpaper, starting from the ceiling. If you plan to replace the ceiling-mounted skirting, remove it. Try to take out the garbage from the room as it accumulates.

Remove the floor skirting. Lastly, remove the floor covering.

Windows and doors

If you plan to replace the window and door blocks, dismantling the old ones is better at this stage. You may need a Bulgarian, a puncher, a crowbar. To begin work better from the old window sill, and afterwards to proceed to the frames. If in the process of dismantling you find a plaster leaving the wall - knock it down right away. To fix a piece of the collapsed wall will not succeed, boldly knock down everything that staggers.

Usually, window and balcony blocks are installed immediately. If professionals help you in this business, as a rule, you will get a window and a window sill, you will have to take care of the finishing yourself.

Similarly, the door unit is dismantled. Remove the door from the hinges, and then use a crowbar and a puncher to loosen the trim. Follow them remove the door frame. Try to work neatly, so as not to damage the walls or ceiling, but everything that crumbles, surely remove. After the completion of the dismantling works, it makes sense to clean and air.

Priming of surfaces

Once the preparatory work is completed, you will again have the question of what to do first: floor, walls, ceiling or slopes? Professionals recommend covering all surfaces with a primer, even if some of them you plan to hide behind the GKL. Start from the top, then proceed to the walls. It is important to know: all foam protruding along the perimeter of the window and doors should be gently pruned with a construction knife and primed.

Plaster and screed

First, plaster the walls or do the floor? There can not be two options. Stucco work is considered draft, pollution is imminent. Traces of the solution spoil any floor covering, even the most resistant, so it's not worth the risk, postpone the decorative work for later.

Start working with windows. There are many ways to organize slopes: plasterboard, tile, plastic, plaster. If you plan to plaster, do it first. When plastering ceilings on the ceiling, use a paint net to prevent cracking. In the case where the curvature of the walls is significant, and the difference between the hollows and the hillocks is a few centimeters, be sure to break the surface into hooks and install beacons. Use the level!

And what about the blobs of the solution that fell to the floor? Try to collect them with a spatula until they are frozen. Otherwise, you will have to tinker with their removal. When the walls are ready, you can begin to level the floor with a screed.

Works with plasterboard

Do you plan to simplify the task of leveling the walls or start intricate multi-tiered elements in the decor? All this can be done with the help of GKL. There is no point in too much fussing with the plaster where the plasterboard will be mounted. Screw the profile directly to the walls or the lathing lath, using the level.

And what do they do before - ceiling or walls made of drywall? By and large, there is no difference, many professionals combine this. You can proceed from reasons of convenience and access to various parts of the room.

Stretch ceiling

If you conceived a similar design move, plan the work so that the ceiling is stretched to the finish of walls and floor. First, you need a certain space to install the profile. The distance between the load-bearing frame and the ceiling depends on the presence and type of luminaires - it should slightly exceed the height of the cartridge. Do not risk, judging by yourself, better entrust calculations to a team of professionals who will mount the canvas. By the way, the heat gun, which they bring to your house, can damage the floor covering - and this is another argument in favor of the priority of this work.

Putty, leveling surfaces

It is worth mentioning about this kind of work. What do you do first - floor or walls? Remember again about the fallen blots that penetrate into the texture of the laminate or linoleum, ruin the carpet, damage the parquet. Shpaklyuchte before you take up the floor.

Painting

If you need to paint the radiators, slopes, ceiling, ceiling ceiling - at this time it's time. Do not be afraid if a couple of drops fall to the floor. And all the rough work to this point is completed, the dust does not settle on the fresh paint.

Linoleum and laminate

As a rule, this material is supplied in rolls, the width of which is comparable with the typical sizes of rooms. Remember: to lay linoleum it is necessary in the plastered and otshpaklevannuyu a room in which wallpapers are not pasted yet and the painting of walls is not made. Otherwise, the edge of the floor covering when rolling will damage the decorative layer.

The same recommendation applies to laminate, engineering and parquet boards. Its packing is associated with certain mechanical effects on the surrounding surfaces, moreover, this work is quite dusty. At the same stage, the old parquet is looped and varnished .

Wallpaper

When the floor is ready, you can proceed to the decorative decoration of the walls. Of course, it makes sense to protect the new floor, if there is a risk of damage to it. For example, if you use a ladder, carefully wash their feet and put protection under them.

And what do you do first - floor or walls, if you do not use conventional wallpaper, but, for example, liquid? If you are confident in your abilities, apply the solution after finishing the work with the floor covering. But if you work with such material for the first time, it is better to change these two stages in some places.

Tile

Repair in the kitchen, bathroom and other premises where tiles are used has its own characteristics. This is especially true when you plan to tile the floor or walls. The sequence here is the same: first we deal with horizontal surfaces, and the floor coverings are mounted after.

Warm floor

Today, there are many technologies that allow heating floors. Some of them even eliminate the need to use radiators, being an excellent alternative to central heating. It is reliable, durable and economical enough. Most of the technology is based either on the use of hot water pipes or on the connection to the mains. In any case, when answering a question about what to do first - a warm floor or walls, start from the floor. Installation of the system is not an easy task. You may need to make shtroby for cable or pipes. But not on the decorative layer will go shtroborez? Therefore, proceed to the plastering of the walls only after the floor is filled with a screed over the heating system.

Special cases

It is impossible to cover the variety of existing materials with which you can make modern repairs. Do first floor, walls? How to start work? In what order are processes organized? Decisions on these issues often have to be made on the basis of a specific situation. In order not to be mistaken, always use a simple algorithm. When choosing between two finishing materials, first of all use strong, which is easy to wash. Follow him work with more fragile or brand. Here, as in medicine, the "Do not do harm" rule prevails. Remembering this, you can easily organize the order of work during the repair of your home.