Today, when personal life becomes so vulnerable, I want to hide from prying eyes. Especially such a need arises in a private house or on a country plot. To ensure that outside observers do not interfere with work and rest, fences around the site are installed. For them, choose a variety of materials: metal rods, wood, brick, stone. However, the most popular material for fences is corrugated board, or profiled sheet.

This material is popular due to its low price. In addition, the proflist also has a number of advantages. So, outsiders will not be able to follow what is happening on your site through the fence of the profiled sheet, which, if desired, can be up to 7 meters in height. This fence perfectly reflects all the sounds. Moreover, you do not need to hire professionals to install a fence from the profiled sheet. With your hands, having the right tool, it's easy to do. Also, the time spent on installing this fence is not large. Quickly, you can determine where the fence line will pass, set up poles and sinks and sew them with a profiled sheet. In addition, corrugated board is famous for its durability. Up to 20 years will be a galvanized corrugated board, and more than 30 - profiled polymer coated. The assortment includes the color and dimensions of the profiled sheet.

In order to install a fence from the profilist with your own hands, you need common building skills and tools. The process of installing the fence begins from the measurement of the perimeter of the enclosed area, as well as the location of the gate and the gate and the height of the fence. Immediately, there are places where the fence posts will be installed. The next stage is the installation of support racks. Pillars for support may be steel pipes. It is recommended to take them with a diameter of 57 mm. You can also use profile pipes, the cross section of which should be not less than 60x60 mm. The length of the pillars depends on the height of the fence.

After the corner supports are installed and the measuring cord is pulled, the rest of the supports are marked out. They must be strictly along the line at a distance of not more than 3 m from each other. Then, we dig pits for each support with a depth of 0.6 m and more, and a width of 20 cm. Each pipe in the pit is leveled. The pillars can be fixed with temporary metal or wooden struts. And only now you can pour pits with concrete. This is halfway to how to make a fence from the proflist. If you neglect this and just hammer the supports into the ground, they will constantly be under the influence of moisture and quickly fail, and a fence made of profiled sheet, with your own hands installed, will not last a full period.

Three days after the pouring of concrete, it is necessary to weld logs - transverse veins. It is best to use steel profile pipes, the cross section of which is 40x25, 60x40. If the height of the fence is not more than 2 m, then two is sufficient. If the fence of the profiled sheet, built with your own hands, is higher, then you need to add one more in the center. To metal parts of the frame served for a long time, without undergoing corrosion, they must be treated with a metal primer and painted with enamel twice.

When the frame is ready, fasten the corrugated board with the help of self-tapping screws of the same color. They must be screwed into the cavity of the profile at a distance of 25-35 cm.

Now you know how to build a fence of profiled sheet. If small damages are formed on the coating during installation, they can easily be removed with paint in the can. You can buy the paint of the right color in the same place as the corrugated board.