How and where to get a warrant for excavation work?

To perform excavation work on the territory of a city settlement (on alleys, streets, sidewalks, roads, in green areas, etc.) it is necessary to obtain an order from local authorities. This requirement is due to the need to prevent damage to the elements of improvement, engineering networks. The established procedure for granting permits is aimed at creating proper operating conditions for facilities, preventing traffic accidents. Let's consider what the warrant for excavation works is. документа также будет представлен в статье. A sample of the document will also be presented in the article.

general characteristics

как и в любом другом городе страны , представляет собой бланк унифицированной формы. The warrant for excavation works in Moscow, like in any other city in the country , is a blank form. It is filled before the immediate implementation of the activities. предоставляет исполнителю право начать необходимые процедуры в соответствии с проектными документами. The Earthwork Order gives the contractor the right to initiate the necessary procedures in accordance with the project documents. The registration of the permit, as well as the monitoring of the implementation of the planned measures, are entrusted to the territorial administration of the housing and communal services. Legislation prohibits work without a warrant.

Terms of Delivery

– законодательно установленная процедура, предусматривающая предъявление определенных документов. Obtaining an excavation order is a legally established procedure that provides for the presentation of certain documents. Collection of necessary papers is carried out by the executor. , являются: The main documents on the basis of which the opening of an excavation work order is carried out are:

  1. Written statement. It is composed by the executor. The application shall indicate the type and timing of the activities.
  2. Copies of the passport of the entity responsible for the work and the order for its appointment.

New construction / reconstruction / overhaul of buildings

в указанных случаях осуществляется при представлении следующих документов: Execution of an excavation order in these cases is carried out when submitting the following documents:

  1. Project documentation. In its composition there should be plans for the organization of a construction site, engineering communications, improvement.
  2. The traffic scheme, coordinated with the territorial division of the State Traffic Safety Inspectorate, for the closure or restriction of traffic for the duration of the work, if they are conducted on the road.
  3. Schedule of activities. At the same time, the period for the complete restoration of the road surface, green spaces and other elements of improvement, which are violated in connection with the performed activities, should be indicated. The schedule is approved by the contractor and the customer.

These documents are attached to the main securities listed above. выдается для устройства скверов и парков. Similar information is provided in the event that an excavation order is issued for the arrangement of parks and parks.

Additional papers

In addition to the above documents, the authorized authority requests:

  1. Permission for construction or reconstruction.
  2. Right-establishing documentation for the site. This may be a lease agreement, a law on state registration of property rights.
  3. Notification of the transfer of the premises to the category of residential / non-residential, if necessary.
  4. Decree of the Administration on the closure of traffic on roads. It appears, if excavation works are carried out in an open way.
  5. Planning layout of the site, agreed with the chief architect of the city.

Installation of advertising structures

в этом случае представляется при предъявлении основных документов, а также копии дежурного плана городской территории. The warrant for earthworks in this case is submitted upon presentation of the main documents, as well as copies of the on-duty plan of the urban area. It indicates the location of the structure. As in the previous case, the executor submits an approved timetable for the completion of activities with information on the deadlines for the completion of the restoration of disturbed objects. In addition, the following documents are requested:

  1. Permission for installation and subsequent operation of the structure.
  2. Title documents on the site.

Capital and current repair of utilities

необходимо представить следующее: To get a warrant for excavation, you must provide the following:

  1. Executive survey of networks. It should indicate the place where the work will be performed.
  2. The scheme of organization of closure or traffic restrictions, agreed with the traffic police.
  3. Schedule of measures for the complete restoration of disturbed objects.

Additionally, the following are submitted:

  1. Permission to lay utility networks.
  2. Decree of the administration on the closure of traffic on the roads.
  3. Title documents on the site.
  4. Planning layout of the territory, agreed with the chief architect.

Emergency order for excavation works

Permission to perform restoration activities on the engineering network sites is provided upon presentation of the main documentation. And:

  1. Executive survey of networks. It should indicate the place of work.
  2. Title documents on the site.
  3. The scheme agreed with the traffic police, and the decree of the head of administration on the closure of traffic on the roads.
  4. Schedule of measures for the restoration of disturbed elements of improvement.

In the event of liquidation of accidents at water supply, sewerage networks and other utilities, it is allowed to carry out works without delay. However, in this case, the object's balance-holder, the management of the housing and communal services, should be notified of them. The notice indicates the exact location of the works, their nature. Within two consecutive days, the contractor must send an application for authorization.

Obtaining a warrant for excavation work

The consideration of the submitted documents is carried out by the authorized body within three days. At the end of this period, a decision is made. If the applicant is denied, he is notified. The notice provides the reasons for which a negative decision was taken. ордера на производство земляных работ. If the authorized body has no claims to the submitted documents, an order for the excavation works is issued .

An Important Moment

хранится у субъекта, назначенного ответственным за выполнение мероприятий. The warrant for excavation works is kept by the entity appointed by the person responsible for carrying out the measures. The permit must be presented at the request of persons who have the right to control the activities of the performer, the state of the elements of improvement and other infrastructural facilities. Activities that are carried out without a warrant must be immediately terminated.

Extension

A warrant for excavation works is provided for 30 days. Permission can be extended. To do this, the contractor sends a written application, which explains the reasons for which there was a corresponding need. The request is submitted no later than three days before the expiration of the previous document. After the end of the established period, the warrant loses its validity. Accordingly, an overdue document can not be used as a basis for the implementation of planned activities. The production of work with expired warrant is regarded as unauthorized execution. The extension of the permit in this case is allowed only after all the guilty persons are brought to administrative responsibility. The validity of the warrant for performing emergency repairs in buildings and utilities is not allowed to be increased.

Procedural issue

To extend the order, you must submit the following documents to the administration or territorial administration of housing and communal services:

  1. A permit issued earlier.
  2. Schedule of activities.

These papers are submitted personally by the applicant. Upon the expiration of the validity of the documentation submitted earlier, the responsible person is obliged to extend them and present them when the application is submitted. It is, in particular, a power of attorney, a contract of employment, etc.

Obligations of the performer

Prior to the commencement of activities, the entity must:

  1. Coordinate the scheme of work with the territorial division of the State Traffic Safety Inspectorate.
  2. To set up fences, traffic signs, ensuring the safety of pedestrians and vehicles during the day.
  3. In the night and evening time, indicate the area with light signals of red color.
  4. Call representatives of enterprises that have communication networks underground.

On the fences hang signs with the name of the organization that performs the activities. If the work affects the schedule or routes of public transport, the contractor must inform the public about it through the media. Installation of road signs, fences, creation of temporary crossings and transitions is carried out by the means and forces of the organization performing the activities. In this case, the performer is guided by the approved schemes for their placement. Deviation from them during the production of works is not allowed. The executor can start implementing the measures only after the entire site has been completely equipped with all necessary fences, signs and signaling means. Personnel involved in the work must have overalls and PPE in accordance with the type of activity and the conditions for its implementation.

Special rules

During the excavation of trenches / trenches on the mainlines it is prohibited to store soil on the roadway. All materials should be placed within the boundaries of the fenced area. The soil, which is unsuitable for backfilling, is exported as the work progresses. In the process of eliminating damages to heat, sewerage, water supply networks, it is prohibited to pump water to the carriageway, the territory of sidewalks and other places from where it can enter the road surface. It is forbidden to fill the wells of underground structures with building materials and soil. They should be provided with unimpeded access at any time. Filling of excavations and trenches in areas with improved coating is carried out, in accordance with the standards, with careful packing.

Restoration of the elements of improvement

It is carried out by the performer of excavation by his own means and forces or by agreement with the balanceholder of the object. In the latter case, the advance payment is transferred to the settlement account in the amount of replacement cost. The amount of damage caused to the object of improvement is established by the balance-holder. In doing so, it is guided by the Replacement Cost Determination Method . If the entity that damaged or destroyed the object of improvement is not established, the necessary measures are carried out at the expense of the owner's funds.

Responsibility of the performer

The organization of maintenance, repair and other work should be carried out in accordance with the project design document and other papers. In the process of activity, performers, among other things, are guided by state standards. For subjects, an administrative penalty is imposed in the event of:

  1. Earthworks in the absence of a warrant.
  2. Overlapping the roadway without agreement with the territorial division of the State Traffic Safety Inspectorate.
  3. Failure to comply with the deadlines for the production of excavation works and remedial measures to eliminate damage caused to elements and objects of improvement.
  4. Failure to comply with the established sanitary and epidemiological regulations on the site.
  5. Non-compliance with the terms of the warrant for the restoration and improvement of damaged surfaces.

The perpetrators of violations are held accountable, depending on the seriousness of the offense. Legislation also provides for disciplinary and criminal penalties for such persons.