The organization's activities are conducted in accordance with the law "On Self-Regulating Organizations" and the Urban Development Code of the Russian Federation. SRO is a non-profit organization that is based on legal entities and individual entrepreneurs working in the construction industry. To some extent, the admission of the term is analogous to the license. Self-regulating organizations are created to control construction firms. In order to avoid scammers, unscrupulous entrepreneurs and to prevent unforeseen situations, strict control over the actions of firms is conducted. Execution of works without SRO admission leads to administrative punishment or liquidation of the firm.

In this article we will tell you everything about the clearance in the SRO - engineering surveys, energy audits and other activities.

First, let us consider the requirements imposed by the SRO to its members.

- The organization should include at least five employees working in this field for more than five years. Education of employees - higher or secondary special.

- At the enterprise should work more than three experts with the experience of work on this trade from three years. Special education is required.

- The presence of necessary equipment, equipment and inventory, which is required for the performance of work, is mandatory.

- SRO can also make other demands if it considers it necessary.

If your organization complies with all SRO rules, then by collecting the required package of documents, you can apply for membership.

Engineering surveys are works that are conducted to fully study the terrain of a particular site. The soil, location and parameters of the site, the proposed building materials and other elements important for construction work are examined. The natural environment is also checked , it is necessary for the further forecast of changes in the environment, which will be affected by the construction. Research is carried out in a complex way, they are necessary for the collection of materials, information about which will be needed for further work plans. Thus, it is possible to develop optimal economic and technical schemes of work. Any construction work begins with engineering research, it helps in the future to make the most accurate calculations for the future.

Engineering geodesic, hydrographic, geocryological, topographical works and observations, geological studies, study of objects in this field, seismological and hydrometeorological studies, environmental surveys - works that require clearance in the SRO.

An organization planning to conduct energy surveys should obtain admission to these works. The SRO certificate will allow an entrepreneur, a legal entity or an individual to formally perform an energy audit procedure, since only the SRO members are entitled to conduct energy audits . In order to obtain admission, an enterprise must comply with the requirements of the SRO for all established items, collect the necessary package of documents, pay a fee and apply for membership. Admission to SRO allows entrepreneurs to independently conduct energy audits in their company, which significantly reduces financial costs and time, because now there is no need to seek help from outside organizations for this procedure.

There is a certain list of types of activities that must admit a self-regulatory organization. For each activity there are rules of entry and work that must be followed.

The SRO certificate does not have a definite validity period, it is unlimited and can be canceled due to the liquidation of the enterprise, gross violation of rules or when the entrepreneur leaves the SRO.